Salinas Valley State Prison and Correctional Training Facility Soledad Solar Project

5 Documents in Project

Summary

SCH Number
2012071074
Lead Agency
Department of General Services (DGS)
Document Title
Salinas Valley State Prison and Correctional Training Facility Soledad Solar Project
Document Type
NOD - Notice of Determination
Received
Posted
9/11/2018
Present Land Use
vacant; city public facility; city public/institutional
Document Description
The project would install and operate two adjacent pv solar power generation facilities totaling approx 4.25 MWac on 25.5 acres of undeveloped lands within the Salinas Valley State Prison/Correctional Training Facility parcel. The SVSP subarea is 8.7 acres and would include 5,208 solar panels generating 1.5 MWac. The CTF subarea is 16.8 acres and would include 5.208 solar panels generating 1.5 MWac. Both sites would include: single-axis trackers, arrays of solar panels, string inverters, underground conduits, and associated electrical equipment. New perimeter fencing would consist of 3,600 linearat the SVSP subarea

Contact Information

Name
Terry Ash
Agency Name
Department of General Services, RESD, PSB
Contact Types
Lead/Public Agency

Location

Cities
Soledad
Counties
Monterey
Cross Streets
31625 Highway 101
Zip
93960
Total Acres
25.5
Parcel #
257-021-012
State Highways
US 101
Railways
UPRR
Township
17S
Range
5E
Section
12
Base
MDBM

Notice of Determination

Approving Agency
Department of General Services
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print