Diemer Chlorination System for Ozone Cooling WAter and Post-Filtration Chloration Capacity Increase - Final Design, Procurement and Construction

Summary

SCH Number
2010098073
Public Agency
Metropolitan Water District of Southern California
Document Title
Diemer Chlorination System for Ozone Cooling WAter and Post-Filtration Chloration Capacity Increase - Final Design, Procurement and Construction
Document Type
NOE - Notice of Exemption
Received
Posted
9/3/2010
Document Description
FInal design, procurement of materials, and construction to provide a chlorination system to control quagga mussel growth in the Diemer Ozone Retrofit Program open cooling water loop. Final design, procurement, and construction to increase the chlorination capacity at the outlet of the filters at the Diemer plant to aid in compliance with water quality regulations.

Contact Information

Name
Raeanne Murphy
Agency Name
Metropolitan Water District of Southern California
Contact Types
Lead/Public Agency

Location

Cities
Yorba Linda
Counties
Orange

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301, 2, 3 - Class 1, 2, & 3
Reasons for Exemption
The proposed project consists of the operation, repair, maintenance, permitting, leasing, or minor alteration of existing public or privat structures, facilities, mechanical equipment, or topographic features, involving negligible or no expansion of use beyond that existing at the time of the lead agency's determination.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print