General Waste Discharge Requirements for Existing Dairy Operations within the San Diego Region

2 Documents in Project

Summary

SCH Number
2008111027
Lead Agency
Regional Water Quality Control Board, Region 9
Document Title
General Waste Discharge Requirements for Existing Dairy Operations within the San Diego Region
Document Type
NOD - Notice of Determination
Received
Posted
12/17/2008
Present Land Use
Agriculture / Intensive Agriculture / Multiple Rural Use
Document Description
The project is the adoption of General Order No. R9-2008-0130, Waste Discharge Requirements for existing Dairy Operations in the San Diego Region. This project would regulate the discharge of Dairy Operation wastes to land from the eight existing dairies in the San Diego Region, and covers expansions of the dairies up to 1999 mature dairy cows. The eight Dairy Operations to be regulated under these general requirements are currently regulated under National pullutant Discharge Elimination System (NPDES) orders or individual waste discharge requirements, and the individual orders would be rescinded. The general requirements of this General Order are as stringent as both the NPDES orders and individual waste discharge requirements.

Contact Information

Name
Cathryn Henning
Agency Name
Regional Water Quality Control Board, Region 9
Contact Types
Lead/Public Agency

Location

Counties
San Diego
Cross Streets
multiple

Notice of Determination

Approving Agency
CRWQCB
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print