Tacamo Culvert Project

Summary

SCH Number
2005048217
Lead Agency
Regional Water Quality Control Board, Region 2 (San Francisco Bay), Oakland
Document Title
Tacamo Culvert Project
Document Type
NOE - Notice of Exemption
Received
Posted
4/14/2005

Document Description
The Dept. of Defense TAFB has proposed repair the headwall supporting the existing culverts and installation of security grates on the culverts in Union Creek under Perimeter Road on Travis AFB. The project consists of replacement of the existing broken concrete within the headwall on the upstream side of Parameter Road by excavating and removal along 4 foot long by 42 foot wide section within the creek.

Contact Information
Jolanta Uchman
Regional Water Quality Control Board, Region 2 (San Francisco Ba
1515 Clay Street, Suite 1400
Oakland, CA 94612

Phone : (510) 622-2432

Location

Counties
Solano

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Section 15303(c)
Reasons for Exemption
The project will result in reconstruction of the existing headwall. There will be no or very little impact to the environment.
Download CSV New Search