City of Rio Dell Raw Water Intake Project
3 Documents in Project
Summary
SCH Number
2004112061
Lead Agency
City of Rio Dell
Document Title
City of Rio Dell Raw Water Intake Project
Document Type
NOD - Notice of Determination
Received
Posted
4/12/2005
Present Land Use
Vacant / Town Center
Document Description
The project includes permitting, designing, and constructing a permanent water supply system to serve the residents of the City of Rio Dell. The existing system is temporary and has failed eight times since its installation in 2001. Supply failures have lead to domestic water shortages for the City's residents. Interruption of the water supply results in public health, safety, and welfare threats. The proposed system consists of an infiltration gallery intake and wet well located within the Eel River. The intake facility will be constructed on a City-owned parcel. A temporary access road, needed for construction of the intake facility, will be constructed on California Dept. of Fish and Game property immediately east of the City property.
Contact Information
Name
Eli Naffah
Agency Name
City of Rio Dell
Contact Types
Lead/Public Agency
Phone
Location
Cities
Rio Dell
Counties
Humboldt
Cross Streets
Edwards Drive, East Bridge Street
Total Acres
+/-1.3
Parcel #
053-181-03
State Highways
U.S. Highway 101
Schools
Rio Dell Elementary
Waterways
Eel River
Township
1N
Range
1E
Section
5
Base
HB&M
Notice of Determination
Approving Agency
City of Rio Dell
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.