Long Beach Memorial Medical Center Expansion
6 Documents in Project
Summary
SCH Number
2004081142
Lead Agency
City of Long Beach
Document Title
Long Beach Memorial Medical Center Expansion
Document Type
NOD - Notice of Determination
Received
Posted
9/6/2005
Present Land Use
Mixed-Use District, Insititutional (I), Planning Development (PD-29), Regional Highway District (CHW), and Community Automobile-Oriented District (CCA).
Document Description
The RAW addresses the removal and off-site disposal of approximately 28,500 cubic yards (cy) of contaminated soil and provides systems to prevent methane from entering the proposed new buildings. During the environmental investigation of the site, contaminated soils, methane gas, and solid waste debris were fournd in the subsurface soil in the area proposed for building construction.
Contact Information
Name
Maryam Tasnif-Abbasi
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency
Phone
Location
Cities
Long Beach
Counties
Los Angeles
Cross Streets
Long Beach Boulevard / North Spring Street
Zip
90801
Total Acres
54
Parcel #
7207-010-041
State Highways
I-405, I-710, SR-1
Railways
Metrolink, Amirak
Airports
Long Beach Airport
Schools
Oakwood, Jackie Robinson
Waterways
Los Angeles River
Township
4S
Range
12W,
Section
7
Other Information
Range: 13W
Notice of Determination
Approving Agency
Department of Toxic Substance Control
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.