La Jolla Recharge Basin

5 Documents in Project

Summary

SCH Number
2003041190
Lead Agency
Orange County Water District
Document Title
La Jolla Recharge Basin
Document Type
NOD - Notice of Determination
Received
Posted
5/22/2006
Present Land Use
Vacant nursery and outdoor storage; four single-family residential structures / zoning: SP 94-1, Development Area 1 / GP: General Industrial
Document Description
Construction and operation of a groundwater recharge basin that will increase recharge into the Orange County Groundwater Basin. The new recharge basin would add approximately 9,000 acre-feet of recharge capacity per year. The proposed 10-acre site will include an approximately 5.7-acre recharge basin, a perimeter access road, 3:1 side slopes, a maximum depth of 20 feet, a basin access ramp, and an area where material removed from the basin during cleaning can be temporarily stored. Water for the recharge basin will be provided from the Miller Recharge Basin via Carbon Creek Channel by means of a diversion dam.

Contact Information

Name
Heather McPherson
Agency Name
Orange County Water District
Contact Types
Lead/Public Agency

Location

Cities
Anaheim
Counties
Orange
Cross Streets
East La Jolla Street and Red Gum Street
Zip
92806
Total Acres
9.3
Parcel #
344-172-04, 344-192-02 to 344-192-05
State Highways
SR-57 & SR-91
Schools
Melrose ES
Waterways
Santa Ana River, Carbon Creek Channel
Township
3S
Range
9W
Section
Unsect
Base
SB

Notice of Determination

Approving Agency
Orange County Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print